Project Engineer/ Engineering Coordinator

Education

August 2000
Guilin Technology & Industry College AS, Majored in Mechanical Engineering
July 1997
Guilin Institute of Business Administration BA, majored in Business Administration

Work & Experience

Document Controller/ Project Coordinator Shougang Hierro S.A., Lima, Peru
October 2000 - July 2002

• Maintained and updated all the technical documents for on-going projects.
• Coordinated changes to project requirements with project team, vendors and production team.
Successfully completed in designing the following project:
• Marcona Copper Smelter Revamp

Engineering Technician ( CAD & BOM) General Electric – Aero Energy Division, Houston, Texas
July 2006 - July 2007

• In charge of the bill of material for multi-projects for LMS100, LM6000, LM2500 Turbine Generator projects. Prepared BOM based on 2D and 3D drawings, ensured all parts or changes are reflected in the BOM. Using the well organized BOM to set up a platform for product development, accurate costing and production efficiency.
• Worked with different engineering teams to develop PFD and P&ID.
• Used AutoCAD 2007 to revise up the assembly and fabrication drawings, detail structure drawings. Successfully completed in designing the following projects:
• LMS100, LM6000, LM2500 project. BOM management performance/accuracy was 97% overall in year 2006 and 99% for the first quarter of 2007.

Assistant Project Manager Dresser-rand Control System, Houston, Texas
August 2007 - November 2007

• Assisted PM in the daily administration and coordination of the projects, leveraging limited resources for the PM throughout the operation.
• Updated project Schedules & Cost in MS project; updated shipment status report, Project Vs. Estimate report to keep up tracking the project status.

Engineering Coordinator Dynamic Engineering Inc., Houston, Texas
December 2007 - January 2013

• Coordinated different discipline teams of engineers/specialists such as process, mechanical and control site start-up personnel, technical writers, designers throughout all phases of the projects.
• Reviewed internal and external deliverables including PFDs, P&IDs, equipment/instrument data sheets, operating guidelines, start-up procedures, client/third party submittal drawings and shop fabrication drawings and etc.
• Participated in equipment fabricators bid evaluations, shop audit in Asia and FAT (field acceptance test).
• Participated broad aspects of business development activities including exploring / visiting potential clients, presenting process technologies, preparing proposals, estimating budget and schedules, clarifying client questions and etc.
• Participated in the projects ranging from $3 to $10 Million dollars and involved in different engineering disciplines with the record of 96% on-time deliverables.
Successfully completed design of the following projects:
• 36,000 MTA Polysilicon Plant Trichlorosilane Purification Process (6 trains); Existing Trichlorosilane Purification (3 trains ) revamp to upgrade purity and capacity; 10,000 MTA Dichlorosilane Redistribution Reactors design, fabrication, and start-up, GCL Solar, Xuzhou, China
• 5,000 MTA Polysilicon Plant Trichlorosilane Production, Hoku, Idaho, USA
Asia Sale Support
• Assisted company marketing exhibition booth at annul SNEC PV Power Expo in Shanghai 2009-2012.
• Mentored and trained Chinese office new employees for engineering and translation work. Reviewed and translated the technical documents, proposals, contracts related to Chinese clients and projects

Project Engineer Ventech Engineers International LLC, Houston, Texas
April 2013 - June 2015

• Worked with client and project team to ensure clear definitions of project scope of work, established project schedule and appropriate budget and quality control.
• Worked closely with a project manager, addressed issues in between clients and company; tracked the deliverables in different phases of the project; coordinated with the engineers regarding any design changes or engineering change orders.
• Reviewed the key documents such as BED, P&IDs, PFDs, quotation, purchase order, final contract…etc; scheduled and participated internal meetings with engineers and designers; facilitated the external meetings with clients.
• Monitored progress of the project and compare actual costs with estimates; prepared monthly reports for top management.
• Develop PEP (Project Execution Plan), JDB (Job Data Book), SOW (Scope of Work), FEP (Field Erection Plan), and ECP (Engineering Completion Plan).
• Coordinated activities of the engineering team, construction team and vendors. Participated PHA, FAT, interface meetings, ensured the clear communication and efficiency of the work flow.
Successfully completed in designing the following projects:
• 20,000 BPD Dakota Prairie Refinery Project, Dickinson, North Dakota
• 25,000 BPD Sinclair Refinery Solution, Casper, Wyoming

Engineering Coordinator Velocys Inc., Houston, Texas
September 2015 - December 2016

• Worked with engineering project manager to develop and maintain overall monthly project report.
• Assisted to develop work schedule base on limited human recourse.
• Maintained the project data base and in charge of document control for all on-going project using Aconex .
• Tracked actual cost against budget/forecast.

Candidates Video